
Construction of three more motorized bridges in Mustang, 84 percent physical progress
Myagdi. Three motorable bridges have been constructed in Mustang along the Beni-Jomsom-Korla road of the national[...]
Construction of three more motorized bridges in Mustang, 84 percent physical progress
Myagdi. Three motorable bridges have been constructed in Mustang along the Beni-Jomsom-Korla road of the national[...]
Chandra Dhakal’s view: ‘The residents of Phungling will get crores of rupees in investment and 300 jobs in the cable car’
Kathmandu. The Pathibhara Cable Car, which is being built to reach the famous religious site Pathibhara[...]
Ridi-Balkot road closed for a month, work to widen the road by breaking up rocks begins
Gulmi. Gulmi's Ridi-Balkot road, which is part of the Madan Bhandari Highway, has been closed for[...]
Progress of national pride projects is not satisfactory, expenditure is only 25.70 percent
Kathmandu. The progress of national pride projects launched by the government with the aim of providing[...]
11 kilometers of road construction in Jumla in six months
Jumla. The Infrastructure Development Office located here has constructed 11.3 kilometers of roads in the first[...]
Khongtang-Cholanti-Khawa-Panchdhar road is being blacktopped at a cost of 26.1 million
Bhojpur. The blacktop of the Khongtang-Cholanti-Khawa-Panchdhar road has been started. The blacktop has been started from[...]
Prime Minister’s commitment to complete development projects
Kathmandu. Prime Minister KP Sharma Oli has expressed his commitment to complete development and construction projects.[...]
Construction of the ‘Asian Highway’ connecting Asian countries by road is gaining momentum
Belbari (Morang). The construction of the 'Asian Highway', which is being carried out with the main[...]
Dordi Khola receives board approval for issuing rights shares
Kathmandu. The Securities Board of Nepal has granted permission to Dordi Khola Hydropower Company Limited to[...]
82 MW Lower Solu Hydropower Project 95 percent complete, Rs 16 billion investment
Solukhumbu. The construction of the 82 MW Lower Solukhola Hydropower under construction in the Tingla area[...]
Hetauda produces 37 million liters of drinking water daily
Makawanpur. Hetauda Water Supply Management Board is producing 37 million liters of drinking water daily. The[...]
Energy Minister directs to complete underground protection work on time
Kathmandu. Minister for Energy, Water Resources and Irrigation Deepak Khadka has directed the concerned bodies to[...]