
Upgradation of Okhre’s Shahid Gate-Hurbu Bhanjyang road begins at a cost of Rs 38.8 million
Bhojpur. The upgrading of the Shahid Gate-Hurbu Bhanjyang road in Okhre in the district has begun.[...]
Upgradation of Okhre’s Shahid Gate-Hurbu Bhanjyang road begins at a cost of Rs 38.8 million
Bhojpur. The upgrading of the Shahid Gate-Hurbu Bhanjyang road in Okhre in the district has begun.[...]
Environment-friendly transportation and development infrastructure are Nepal’s priorities: Minister Dahal
Kathmandu. Minister for Physical Infrastructure and Transport Devendra Dahal has said that environment-friendly transport and development[...]
Rotor installation inside underground powerhouse in hydroelectric project
Tanahun. The rotor (electric motor) has been installed inside the underground power house of the 140[...]
12 hydropower projects under construction in Myagdi
Myagdi. Twelve hydropower projects are under construction in Kaligandaki, Myagdi, Rahughat and Nilgiri rivers. Once these[...]
Hydropower companies will not be allowed to launch IPOs without starting production.
Kathmandu. The High-Level Economic Advisory Commission has concluded that there should be stricter restrictions on the[...]
A concrete bridge was built in Tanahun at a cost of Rs 270 million, reducing the one-and-a-half-hour journey to 15 minutes
Tanahun. Transport vehicles have started operating from the concrete bridge built over the Kaligandaki River in[...]
Flood destroys under-construction bridge, damages worth Rs. 20 million
Udayapur. The flood following the incessant rains since this morning has damaged the under-construction concrete bridge[...]
Storm disrupts power supply in Banke
Banke. The storm that struck last night caused the collapse of three poles of a 33[...]
Dulegowda-Harkapur road being blacktopped in a hurry
Tanahun. Blacktopping has begun in the Besaregouda section of the Dulegowda-Harkapur Motorway in Shuklagandaki Municipality-4 after[...]
Unpaved roads cause hardship to commuters, demand for upgrading
Simkot. Passengers have always had to suffer due to the unpaved road of Sarkegad Rural Municipality-1[...]