
Bridge and footpath built in Dhorpatan-Gurja at a cost of Rs. 5.5 lakh, making it easier for locals
Myagdi. A wooden bridge has been constructed on the Huchin Khola, which is on the trekking[...]
Bridge and footpath built in Dhorpatan-Gurja at a cost of Rs. 5.5 lakh, making it easier for locals
Myagdi. A wooden bridge has been constructed on the Huchin Khola, which is on the trekking[...]
Construction of 6 roads stalled due to lack of budget
Myagdi. The construction of six road upgrading projects run by the Gandaki Provincial Government through multi-year[...]
Development expenditure reduced by 29 percent by mid-Chait
Kathmandu. Development expenditure has shrunk to 29 percent by the third quarter of the current fiscal[...]
Year 2081 Energy Sector: From first-time electricity exports to agreement to build high-capacity transmission lines
Kathmandu. Some important progress has been made this year in the energy sector, which has been[...]
Upgradation of Okhre’s Shahid Gate-Hurbu Bhanjyang road begins at a cost of Rs 38.8 million
Bhojpur. The upgrading of the Shahid Gate-Hurbu Bhanjyang road in Okhre in the district has begun.[...]
Environment-friendly transportation and development infrastructure are Nepal’s priorities: Minister Dahal
Kathmandu. Minister for Physical Infrastructure and Transport Devendra Dahal has said that environment-friendly transport and development[...]
Rotor installation inside underground powerhouse in hydroelectric project
Tanahun. The rotor (electric motor) has been installed inside the underground power house of the 140[...]
12 hydropower projects under construction in Myagdi
Myagdi. Twelve hydropower projects are under construction in Kaligandaki, Myagdi, Rahughat and Nilgiri rivers. Once these[...]
Hydropower companies will not be allowed to launch IPOs without starting production.
Kathmandu. The High-Level Economic Advisory Commission has concluded that there should be stricter restrictions on the[...]
A concrete bridge was built in Tanahun at a cost of Rs 270 million, reducing the one-and-a-half-hour journey to 15 minutes
Tanahun. Transport vehicles have started operating from the concrete bridge built over the Kaligandaki River in[...]