
Vehicles stopped after bridge collapses on Giruwari River to be operated via alternative route
Triveni (Nawalparasi). Vehicles stopped due to the collapse of the Giruwari River bridge in Chormara, Nawalparasi[...]
Vehicles stopped after bridge collapses on Giruwari River to be operated via alternative route
Triveni (Nawalparasi). Vehicles stopped due to the collapse of the Giruwari River bridge in Chormara, Nawalparasi[...]
Upgradation of Neptechaur-Kaura-Githini-Patlekhet road track 15 years after opening
Myagdi. The road track connecting Ward No. 10 Patlekhet from Beni Municipality-9 Neptechaur via Kaura-Githini-Akhet has[...]
BP Highway blocked, Roshi River washes away diversion, woman missing
Kavrepalanchok. Due to incessant rains, the highway has been blocked for eight hours since Monday night[...]
Financial management of Lapche Tamakoshi and Chepe Khola Cascade Hydropower Projects under the leadership of NMB Bank
Kathmandu. NMB Bank, Nabil Bank, Nepal Infrastructure Bank, Everest Bank, and Dynamic Hydro Energy have entered[...]
Financial management of Bajra Madi Hydropower Project led by NMB Bank, costing Rs 5.35 billion
Kathmandu. NMB Bank Agricultural Development Bank and Bajra Energy Ventures have made a financial arrangement to[...]
World’s tallest bridge under construction in Guizhou, China
Kathmandu. The Huajiang Grand Canyon Bridge, nestled in the mountains of China's Guizhou Province, is set[...]
Serious technical error in the construction of 220 kV transmission line, use of substandard wires contrary to standards
Myagdi. A technically flawed transmission line has been built to connect the electricity generated by the[...]
Renovation of a five-century-old monastery at a cost of Rs. 2.25 million
Mustang. The five-hundred-year-old Sauru Gumba located in Sauru village of Thasang Rural Municipality-2 has been renovated.Social[...]
The Harichour-Malm-Pandavakhani road is being upgraded at a cost of Rs. 400 million.
Dhorpatan. The upgrading of the Harichour-Malm-Pandavakhani road has begun under the 'One Constituency, One Strategic Road[...]
Nearly 500 households in Guthichaur are in darkness after the power outage, and locals complain that the government is not paying attention to generator repairs.
Jumla. 480 households in Guthichaur Rural Municipality-1 here have been without electricity for three months. Local[...]
Postal Highway work in final stage, 44 km of road blacktopped
Dodhara Chandni. The work on the Postal Highway has reached its final stage. An agreement was[...]
Kanchanpur-Kamala road expansion: Construction of overpass begins in Lahan
Siraha. Construction of an overpass has begun at Lahanchowk as part of the expansion of the[...]